$461.25 - Reset ground supported tablet. Excavate site, fill foundation with gravel, set tablet level and plumb, backfill with gravel and soil.
-
$398.75 - Ensure remaining portion of ground supported tablet is level and plumb. Epoxy fragment to base, bracing for 24 hours. Remove bracing and infill seam with Natural Hydraulic Lime mortar 3.5, as needed.
-
$2,600 - Removal of what remains of the Oak tree inside cemetery walls.
-
$2,600 - Removal of tree near East (Academy Sports) side of cemetery wall.
-
$8,000 - Dismantle and rebuild 13’ section of the dry-stacked stone wall on the street side.
-
$8,000 - Dismantle and rebuild 15’ section of the dry-stacked stone wall on the Academy Sports side.
-
$8,000 - Dismantle and rebuild 15’ section of the dry-stacked stone wall on the back side.
-
$8,000 - Dismantle and rebuild 15’ section of the dry-stacked stone wall on the parking lot side.